HYUNDAI OFFICE EXPANSION
Client
HYUNDAI POWER TRANSFORMERS USA INC.
Year
APR 2019 - AUG 2019
Location
MONTGOMERY, AL
Linked white arrow
HYUNDAI OFFICE EXPANSION
SYSCON understands what it takes to see a major construction project to completion. One of the most vital aspects of any successful project is expert planning and preconstruction. SYSCON understands what it takes to see a major construction project to completion. One of the most vital aspects of any successful project is expert planning and preconstruction. SYSCON understands what it takes to see a major construction project to completion. One of the most vital aspects of any successful project is expert planning and preconstruction.
Project Scope Details
DESIGN
ARCHIPLAN LLC
GENERAL CONTRACTOR
SYSCON
MAIN SUBCONRTRACTOR
LOT AREA
32 ACRES
CONSTRUCTION AREA

10,310 SF

Floors

MAIN PLANT: 34 FT HIGH

BUILDING STRUCTURES

MAIN PLANT: S/STRUCTURES + WALL METAL PANEL (3”) + TPO (3”) ROOFING

MAJOR ACTIVITIES

S/STRUCTURES: 63 TONS

CONCRETE: 185 CY INTERIOR WORK W/ MEP

Project Scope Details
GENERAL CONTRACTOR
SYSCON
MAIN SUBCONTRACTOR
LOT AREA
32 ACRES
CONSTRUCTION AREA
10,310 SQ FT
Project Scope Details
LOT AREA
This is some text inside of a div block.
CONSTRUCTION AREA
This is some text inside of a div block.
ELEVATION
This is some text inside of a div block.
BUILDING STRUCTURES
This is some text inside of a div block.
MAJOR ACTIVITES
This is some text inside of a div block.
DESIGN
This is some text inside of a div block.
FLOORS
MAIN OFFICE (34’)
BUILDING STRUCTURES
MAIN PLANT: S/STRUCTURES+ WALL METAL PANEL (3”)+ TPO (3”) ROOFING
MAJOR ACTIVITES
S/STRUCTURES: 63 TONS CONCRETE: 185 CY INTERIOR WORK W/ MEP