DONGHEE-KAUTEX PLASTIC INJECTION PLANT PHASE I & II
Client
Donghee
Year
JUN 2013 - DEC 2013
Location
AUBURN, AL
Linked white arrow
DONGHEE-KAUTEX PLASTIC INJECTION PLANT PHASE I & II
SYSCON understands what it takes to see a major construction project to completion. One of the most vital aspects of any successful project is expert planning and preconstruction. SYSCON understands what it takes to see a major construction project to completion. One of the most vital aspects of any successful project is expert planning and preconstruction. SYSCON understands what it takes to see a major construction project to completion. One of the most vital aspects of any successful project is expert planning and preconstruction.
Project Scope Details
DESIGN
DESIGN-BUILD/ ARCHIPLAN LLC
GENERAL CONTRACTOR
SYSCON
MAIN SUBCONRTRACTOR
LOT AREA
20 ACRES
CONSTRUCTION AREA

PHASE I: 115,342 SF

PHASE II: 94,500 SF

Floors

MAIN PLANT: 75 FT HIGH/ MAIN OFFICE 20 FT HIGH

BUILDING STRUCTURES

S/STRUCTURESWALL

METAL PANEL (2’’)

TPO (3’’) ROOFING

FM CODE APPLIED

MAJOR ACTIVITIES

PHASE I: S/STRUCTURES: 570 TONS + CONCRETE: 2,500 CY

PHASE II: S/STRUCTURES: 450 TONS + CONCRETE: 2,500 CY

Project Scope Details
GENERAL CONTRACTOR
SYSCON
MAIN SUBCONTRACTOR
LOT AREA
20 ACRES
CONSTRUCTION AREA
PHASE I: 115,342 SQ FT PHASE II: 94,500 SQ FT
Project Scope Details
LOT AREA
This is some text inside of a div block.
CONSTRUCTION AREA
This is some text inside of a div block.
ELEVATION
This is some text inside of a div block.
BUILDING STRUCTURES
This is some text inside of a div block.
MAJOR ACTIVITES
This is some text inside of a div block.
DESIGN
This is some text inside of a div block.
FLOORS
MAIN FLOOR (75’) MAIN OFFICE (20’)
BUILDING STRUCTURES
S/STRUCTURES+WALL METAL PANEL (2’’) + TPO (3’’) ROOFING / FM CODE APPLIED
MAJOR ACTIVITES
PHASE I: S/STRUCTURES: 570 TONS CONCRETE: 2,500 CY PHASE II: S/STRUCTURES: 450 TONS CONCRETE: 2,500 CY